Some of our refurbishment projects..
Applecross Senior High School
$0.2M – CAFETERIA CONVERSION
Conversion of the existing staff room into a student kitchen and cafeteria, complete with a barista station, to expand the school's VET program. The scope was inclusive of customised stainless steel fit out.
Kalamunda Senior High School
$0.3M – SCIENCE ROOM UPGRADE
Complete refurbishment of the existing science room including demolition, flooring, electrical, hydraulic, gas, benches, carpentry, mechanical, and painting
HBF Stadium
$0.3M – GYM EXPANSION
Demolition to combine rooms and improve the layout, remove existing carpet, and replace with flooring, supply, and install new mechanical services, complete internal renovation/carpentry and second fix, Install mirrors and gym equipment, upgrade fire services to compliant standards
Department of Fire & Emergency Services (Metro)
$0.07M – TUNIC ROOM UPGRADES
Due to the proximity of the fire station engine room bays to the tunic rooms and the ingress of diesel particulates, the stations have been progressively upgraded to create a sealed and positive-pressure environment. The station tunic room scopes include demolition, design of structural steel frames mezzanines, staircases, and custom fabricate racking systems